Summer 2018 Projects

New Sprinkler System throughout the cafeteria, library & 100s level

401 & 401, 501-504 new exhaust ventilation system installed

300s hallway, new tile

Red Brick 8th street stairs remodeled

Painting Locker Rooms, Hallways, Stairwells & high traffic areas

Every floor was stripped & waxed

Red Brick Basement was painted including the floors & walls

MACC (Gym) Floor was refinished

Upgraded Sound System in the MACC